| Class | Description |
|---|---|
| ARINC |
ARINC Resource Model - Abstract Component Interface.
|
| DMSchedulability_arinc |
Compute optimal bandwidth and deadline (DM, EDP).
|
| DMSchedulability_edp |
Compute optimal bandwidth and deadline (DM, EDP).
|
| DMSchedulability_periodic |
Compute optimal bandwidth and deadline (DM, Periodic).
|
| DMSchedulability_sirap |
Compute optimal bandwidth and deadline (DM, Periodic).
|
| DPRM |
Dual Periodic Resource Model (DPRM) - Abstract Component Interface.
|
| EDFSchedulability_DPRM |
Compute optimal bandwidth and deadline (EDF, DPRM).
|
| EDFSchedulability_edp |
Compute optimal bandwidth and deadline (EDF, EDP).
|
| EDFSchedulability_MPR |
Compute optimal bandwidth and deadline (gEDF, MPR).
|
| EDFSchedulability_periodic |
Compute optimal bandwidth and deadline (EDF, Periodic).
|
| EDP |
EDP Resource Model - Abstract Component Interface.
|
| EQVPRM |
Overhead-free Equivalent Periodic Resource Model (EQV PRM) - Abstract Component Interface.
|
| MPR |
Virtual Clustering Resource Model (MPR model) - Abstract Component Interface.
|
| Periodic |
Periodic Resource Model - Abstract Component Interface.
|
| Sirap |
SIRAP Resource Model - Abstract Component Interface.
|